A promising placer gold deposit in Eastern Kazakhstan with estimated resources of up to 5 tonnes of gold and beyond.
Shagan-Obo Project
Contact Us
Investment Presentation
Key Project Metrics
  • Metric
    Estimated Resources
    System Length
    Licensed Area
    Depth of Occurrence
    Licensed Plots
    Planned Production
  • Value
    Up to 5 tonnes and more
    22 km
    4180 ha
    Up to 6 m
    10
    Up to 500 kg and more
High Investment Potential
  • Shallow Deposit Depth
    Up to 6 meters below the surface.
  • Simple Mining Technology
    Minimal equipment and workforce requirements.
  • Rapid Project Launch
    Project status: commencement of mining operations.
  • Existing Infrastructure
    Power supply, water resources, and access roads.
  • Low CAPEX
    Relatively low initial capital investment requirements.
Project Location
  • East Kazakhstan Region
  • Zaisan District
  • Shilikty Valley
  • 50 km from the district center
  • 11 km from the nearest settlement
  • Border area with China
4G Connectivity
Power Supply
Water Supply
Access Roads
  • 22 km Placer Deposit Length
  • Multiple Commercial Mining Areas
  • Gold Grades of up to 5.74 g/m³
  • High-Purity Gold
  • Strong Potential for Further Exploration
Confirmed Deposit Potential
  • High-Purity
    Gold
    850–915 fineness
  • Gold
    Grade
    0.2–5.74 g/m³
  • Verification
    Pitting
    Confirmed the presence
    of gold-bearing horizons
  • Resource
    Expansion Potential
    Richer mineralized zones
    are projected upstream
Exploration History of the Deposit
1970
Initial Discovery
of Gold Occurrences
2008
Rediscovery and Identification
of Terrace Placers
2011–2012
Identification
of Seven Prospective Areas
2025
Verification Pitting and Confirmation
of Gold Mineralization
Today
Commencement
of Mining Operations
  • №2285-EL
  • №2400-EL
  • №2401-EL
Project
License Portfolio
✔ 6-Year Exploration License Term
✔ 100% Owned by SRS PROJECT LLP
✔ Rights for Artisanal Mining Obtained
✔ 10 Licensed Areas
Phase I
2021–2026
Project Preparation
✓ Completed
Phase II
2026
Production Launch
In Progress
Phase III
2026–2028
Growth and Development
Phase IV
2028+
Business Expansion
Why the Project is Attractive to Investors
  • Low CAPEX
  • Rapid Path
    to Positive Cash Flow
  • Obtained Licenses
  • Established Infrastructure
  • Strong Gold Market Conditions
  • Resource Expansion Potential
  • International Standards
    of Governance
  • Scalability Opportunities
Shagan-Obo — The Foundation of SRS PROJECT's Long-Term Growth